WA Visitors Centre

Location
55 William Street, Perth WA
Client
Tourism WA
Date
Completed 2011

This project required a full strip out of 900m2 of office ceilings, walls and floors whilst other existing tenants remained operational.

New Offices, Staff Hub, Workstation and Boardroom were constructed utilizing existing Timber Framed Glazed Partitions.

The Project is a show piece for Visitors arriving in Perth.

This Project has a very high end finish with materials of top quality being used as specified.

The WA Visitors Centre had a very short time frame. Works were carried out to achieve staged handover for the client to move in. Separable Portions were instructed to The Slatter Group WA post award of Tender. Although the client requested additional costs for Separable Portions no costs were put forward due to the Management approach and The Slatter Group WA’s ability to program the works so as to not incur additional costs.

The Joinery subcontract was a nominated Contractor. There were very high management components to this task to ensure all works were completed on time and with no defects.

Working closely with both the Client and Superintendent to ensure any concerns and expectations were met which meant the Project ran smoothly and efficiently.

TYPE OF SERVICES REQUIRED

Demolition, Electrical, Mechanical, Hydraulic, Ceilings and Walls, Cabinet and Joinery, Tiling, Painting, Glazing, Carpet floor coverings, Carpentry, Wall Paper.

SIMILARITIES WITH THE TENDER:

  • This contract required the demolition and replacement of existing infrastructure.
  • The client is a government organization and required The Slatter Group WA team to understand and comply with government policies, procedures and standards.