Unit 1A, 151 Herdsman Parade Wembley WA 6014

This Project consisted of the fit out of a new orthodontics clinic in an existing commercial development. Initial works commenced with construction of partition walls to form the requirements for the orthodontist. Rooms included a reception waiting area, sterile room, consult room, x-ray room and open practice area. Construction of the x-ray room required walls to be constructed out of specialised wall linings. Due to medical services being installed including compressed air systems, suction lines and sterile water services, there was ongoing coordination between the client, the building contractor, specialist trades and the architect.

Works were completed with the fit out of the new orthodontist with medical grade cabinetwork,extensive lighting and installation of new dental equipment including dental chairs and sterilisers.To ensure that the end product would be suitable for the client’s requirements, and compatible with any equipment the client planned to use in the finished dental clinic, it was necessary to maintain an open line of communication with the client, architect and specialist trades throughout all stages of the works. Any unforeseen issues or complications that arose on site were dealt with in a prompt, timely and professional manner by The Slatter Group WA project team and their subcontractors, which lead to the delivery of a successful project on time and to a high quality.

SERVICES PROVIDED

Electrical, Mechanical, Hydraulics, Specialised Dental Equipment, Ceilings and Walls, Cabinetworkand Joinery, Carpentry, Tiling, Vinyl floor coverings, Painting, Glazed partitions, Loose Furniture,Polished Concrete.