Unit 1A, 151 Herdsman Parade Wembley WA 6014

New Warehouse and Mezzanine Office

Location
Client
Date
Completed 2013

Duration of Project: 35 weeks, 2013 This project is a Design and Construct contract for two new individual tenancies, a truck workshop and a motorsport workshop both with offices, under the one structure. It is a tilt panel construction with a structural steel roof and mezzanine floor to each tenancy, with the exterior façade cladded in Colorbond.