This project required the demolition of the existing offices on Level 2, parts of Level 1 and the Mechanical Plant Room on Level 3. The new works eventually included the substantial upgrade of all services throughout the building and the new fitout works to provide an open plan work area for Curtin University Staff. The works were conducted within tight program requirements and whilst portions of the building remained occupied by Curtin staff and students. There was a substantial growth in upgrading services throughout the building and this could have delayed works with significant impact upon teaching operations. Through a proactive project team and close working relationships the increased scope of works were incorporated into the existing program with minimal fuss.

This project in particular highlighted the benefit of partnering with The Slatter Group as our pragmatic and co-operative approach minimised the impact of these scope changes. This project was completed on time and to a high standard. Importantly, a good relationship was maintained with the clients and there was minimal disruption to teaching operations.

TYPE OF SERVICES REQUIRED

Demolition, Electrical, Mechanical, Hydraulics, Security, Fire, Ceilings and Walls, Steelwork, Roofing, Glazing, Cabinetwork and Joinery, Carpentry, Floor Coverings, Painting, Workstations and Loose Furniture.